Construction of approximately 58 miles of new 138 kV transmission line running from the Holmes Substation in Menominee County (MI) to the Old Meade Road Substation near Escanaba in Delta County (MI). The project includes rebuilding of approximately 30 miles of the existing 69 kV 6910 and Mead lines which will be built as a double circuit along the new construction. Construction includes 487 steel structures, and 77 concrete pier foundations, dug by MJE Drilling. The 138 kV circuit is T2-477 Hawk ACSR conductor with OPGW for the shield wire and the 69 kV circuit is T2-4/0 Penguin ACSR conductor with a 7/16 EHS shield wire. Further detail on ATC's Bay Lake Project can be found on ATC's website.
customer: ATC
OWNER: American Transmission Company (ATC)
PROJECT STATUS: Completed