Lordstown Energy Center
Warren, OH
Engineering, procurement, and construction (EPC) contract including the complete engineering, design, supply, inspection, delivery, installation, testing, and commissioning for two 345 kV switchyards (collector yard and interconnect yard) with an interconnecting transmission line between the two facilities. The interconnecting yard, which interfaces into the FirstEnergy transmission system, is a five breaker ring bus with disconnect switches and associated relaying, metering, RTU, SCADA, and other miscellaneous supporting equipment. The collector yard is a four breaker ring bus with disconnect switches and associated relaying, metering, RTU, SCADA, and other miscellaneous supporting equipment which interfaces into the Lordstown Clean Energy generating facility.
customer: Lordstown Energy Center
OWNER: Clean Energy Future
PROJECT STATUS: Completed