Almeda - Twining 138 kV/230 kV Line
|
|
Location: 
|
Standish,
MI
|
|
Customer: 
|
Michigan Electric Transmission Company
|
|
|
Project Status: 
|
In-Progress
|
|
Owner: 
|
International Transmission Company
|
|
|
Rebuild of an existing 138 kV transmission line over approximately 25 miles from the Twining Substation to the Almeda Substation. The scope also includes 3 miles of double circuit line that taps into the Duquite Substation. The existing three legged lattice towers will be removed and replaced with steel monopoles and 8 lattice towers. The new line will be built to 230 kV specifications. The entire line is in deep right-of-way through 54 wetland areas and will require extensive matting.
|
|
|
|
|
|
|
Bayonne Energy Center
|
|
Location: 
|
Bayonne,
NJ
|
|
Customer: 
|
Barton Malow
|
|
|
Project Status: 
|
In-Progress
|
|
Owner: 
|
Bayonne Energy Center, LLC
|
|
|
Electrical and high voltage installation for the eight dual-fuel Trent-60 Rolls-Royce Gas Turbine Generators operating in simple-cycle mode at the new Bayonne Energy Center including ring bus and switchyard.
|
|
|
|
|
|
|
Bemidji - Grand Rapids 230 kV Line
|
|
Location: 
|
Cass Lake,
MN
|
|
Customer: 
|
Otter Tail Power Company
|
|
|
Project Status: 
|
In-Progress
|
|
|
New construction of approximately 70 miles of 230 kV transmission lines between Bemidji and Grand Rapids Minnesota. The transmission line runs primarily adjacent to U.S. HWY 2 through five counties including the Chippewa National Forest and the Leech Lake Band of Ojibwe Reservation.
|
|
|
|
|
|