Skip links

Robison Park – Twin Branch Line & Foundations

Michigan | 2019

Transmission – MJ Drilling

Rebuild of a 138 kV double-circuit line on 49 structures with 795.0 kcmil ACSR 26/7 Drake conductor, one 7 #8 Alumoweld shieldwire, and one 48-fiber OPGW shieldwire. The rebuild also included access roads, storm water pollution prevention plan management, and structure/conductor installation and retirement.

BACK TO PROJECTS