345 kV Energized Repair
Date:
April 20, 2020
Illinois | 2016 Energized – Transmission Repairs on an energized 345 kV line including changing out full tension splices at five locations along with replacing non-tension jumper sleeves and adding three shunt rods at three locations. All work was completed utilizing the bare-hand method.
345 KV ENERGIZED REPAIR