Skip links

345 KV ENERGIZED REPAIR

Illinois | 2016

Energized – Transmission

Repairs on an energized 345 kV line including changing out full tension splices at five locations along with replacing non-tension jumper sleeves and adding three shunt rods at three locations. All work was completed utilizing the bare-hand method.

BACK TO PROJECTS