Skip links

ACE Reliability Project

New Jersey | 2020

Transmission | MJ Drilling

Rebuild of a 4-mile 69 kV single-circuit line with distribution underbuild from Rio Grande to Wildwood, NJ.  The 80 wood poles, originally erected in 1955, were replaced with the new structures set on direct embed foundations installed by MJ Drilling using vibratory caissons.

BACK TO PROJECTS