Bay Lake 1 Line

Wisconsin | 2018

Transmission – MJ Drilling

Constructed 46 miles of new 345 kV and 138 kV transmission lines connecting 6 substations. Rebuilt a portion of the existing double-circuit GCMW lines and re-routed some existing lines. For more project information visit https://www.atc-projects.com/projects/bay-lake-project-wis/