Skip links

Wolfpack Project

Wisconsin | In Progress (2021)

Pulp & Paper

Above grade electrical and instrumentation throughout the boiler island and installation of temporary power at a packaging facility. For more information visit http://gbp.com/wp-content/uploads/2018/08/GBP-Groundbreaking-Press-Release.pdf

BACK TO PROJECTS