El Cabo Underground Collection System

New Mexico | 2017

Renewable Energy

Construction of more than 243,000’ of underground collection system through rocky terrain for 142 Gamesa 2.1 MW turbines. Trencor 1360 trenchers followed Ozzie’s Padders to screen and backfill native material into the trench. Collection cable installation using GPS guidance and a cable plow to make the final pass. For more information visit https://www.iberdrola.com/press-room/news/detail/iberdrola-adjudica-los-aerogeneradores-de-su-parque-eolico-de-el-cabo-en-estados-unidos-a-gamesa-6763037820160708