Skip links

Gro Solar Delta Power Interconnection

Michigan | 2018

Distribution

Overhead 13.8 kV OPGW line and 13.2 kV underground work including directional drilling, vaults, testing, fiber, grounding, and removal and installation of 39 poles. For more project information visit https://www.edf-re.com/project/delta-solar/