Soil trenching, splicing, and terminations for a 425,000′ 34.5 kV URD wind farm collection system. The 200 MW facility
consists of (66) 2.82 MW GE and (6) 2.32 MW GE wind turbines.
Iowa | 2021 Renewable Energy
Heartland Divide Wind
BACK TO PROJECTS