HVDC Substation Breaker Replacement

Utah | 2019

Substation – MJ Drilling

Replacement of fifteen 345 kV breakers and twelve 500 kV breakers. Reconfiguration of the existing bus and new equipment installation as well as the removal and replacement of 81 concrete piers caps and concrete tie-beams to accommodate the new breakers and associated equipment.