Wisconsin | In Progress (2021)

Transmission – MJ Excavating – MJ Drilling

Rebuild of approximately 21 miles of 69 kV, single-circuit using T2 477 ACSR Hawk Conductor. Project included excavating and foundation installation. Mitigation for an osprey nest located on one of the structures was required. For more project information visit https://www.atc-projects.com/projects/caldron-falls-goodman/