Skip links

Lordstown Clean Energy Project

Ohio | 2017

EPC – Substation – Process Controls & Instrumentation (PCI)

EPC contract for two 345 kV greenfield switchyards with an interconnecting transmission line between the two facilities. PCI also completed instrumentation for the Energy Center’s power plant. For more information visit https://lordstownec.com/

BACK TO PROJECTS