Renewable Energy – EPC

EPC contract for 30 GE 1.7 MW turbines including a 34.5 kV collection system and substation upgrade. The substation expansion included an additional 120 kV/34.5 kV transformer with high and low side breakers, a new 34.5 kV bus, and bays for two new 34.5 kV collector feeder terminations. This project has over 23 miles of buried collection line, 12 junction boxes, and 34 crossings including a 1,100’ bore of the Pinnebog River.