Skip links

QTS – Fisk Line & Foundations

Illinois | 2019

Transmission – MJ Drilling

Replaced eight and installed two new steel structures. Reconductored two 345 kV, two 138 kV, and static wire. Ten large drilled pier foundations were installed for the new 138 kV line.

BACK TO PROJECTS