Substation – MJ Drilling

Installation included reactor breakers, water separation system, reactor oil containment system, conduit, cable trench, ground grip connection for reactor expansion area, secondary oil containment and drainage, and oil capture tank system grounding and foundations for the expansion including drilled pier and HICO reactor foundations.