Skip links

SWCT Line Rebuild

Connecticut | 2016

Transmission – MJ Drilling

Rebuilt two miles of 115 kV line including replacing the circuits and necessary reinforced concrete drilled shaft caisson foundations. Required extensive coordination due to a railroad ROW.

BACK TO PROJECTS