Rebuilt two miles of 115 kV line including replacing the circuits and necessary reinforced concrete drilled shaft caisson foundations. Required extensive coordination due to a railroad ROW.
SWCT Line Rebuild
Connecticut | 2016 Transmission – MJ Drilling Rebuilt two miles of 115 kV line including replacing the circuits and necessary reinforced concrete drilled shaft caisson foundations. Required extensive coordination due to a railroad ROW.
SWCT Line Rebuild
BACK TO PROJECTS