Skip links

White Hills Wind

Arizona | 2020

Renewable Energy

MJE installed the 34.5 kV collection system for White Hills.  This new wind farm generates 350 MW using 126 GE turbines and delivers power to the grid through the existing 345 kV Mead-Peacock Transmission Line. White Hills, also known as Mohave County Wind Farm, is located on more than 38 sq. miles of federal land in NW Arizona.

BACK TO PROJECTS